Bromsgrove

A new aeration system installed into a brand-new tank, from design handover to successful commissioning.
Project Overview
Value:
£240,000
Client:
Severn Trent Water
Delivery Contractor:
JN Bentley

Suprafilt was commissioned to design, supply, manufacture, deliver, install and commission a complete fine bubble aeration system at Bromsgrove Sewage Treatment Works in the West Midlands. The project involved a full system into a newly constructed tank - a clean-sheet installation with no legacy infrastructure to work around.

The scope covered the full package: AERZEN GM35S Delta Blowers, air main, valve arrangements and in-tank diffuser assemblies. Once the sales team had completed the blower sizing and aeration calculations - determining diffuser counts per zone, flow rates and pipe sizing to meet the treatment requirements for the tank - the project was handed to the engineering team to detail and programme.

Installation ran to a six-week programme on site, with the team working methodically through each phase of the build. The commissioning process included a thorough quality check of every diffuser assembly before the system was brought into full operation.

Ben Murphy, Project Engineer at Suprafilt, said: "Bromsgrove is a good example of how thorough our commissioning process is. The installation ran well, but it's that final stage - checking every diffuser before anything goes live - where you prove the quality of the work."