Case Studies

  • Failsworth
    The installation of innovative Nereda technology at Failsworth WwTw saw the implementation of a more efficient way of working for Suprafilt with the introduction of their ‘off site’ ethos.
  • Kendal
    The installation of the innovative Nereda technology at Kendal WwTW was a first for all parties.
  • Liverpool
    Suprafilt were selected to supply an aeration system for one of the world’s largest sequencing batch reactors.
  • Market Drayton
    Aeration Specialists Suprafilt have seen a 45% reduction in energy usage at Market Drayton Treatment Works after installing the very latest flow inducers, mixers and aeration diffusers.
  • Simpsons Malt
    An aerated grid system installed at Simpsons Malt made an immediate visible difference and paid for itself within a month of installation.
  • Strongford
    Suprafilt successfully provided a new aeration system and associated services for Severn Trent’s Waste Water Treatment Plant at Strongford, Staffordshire.
  • Itchen Bank
    Suprafilt installed a liftable grid in an oxidation ditch, featuring PTFE coated membranes.
  • Cliff Quay
    Suprafilt installed a liftable grid system without draining the tanks during the live installation – working in close partnership with the operators of the Wastewater Treatment Works.
  • Castleford
    Suprafilt carried out a complete aeration solution to the new build works for Yorkshire Water – including blowers, air mains, valves, diffusers and mixers in the anoxic zones that are depleted of dissolved oxygen.
  • Clipstone
    Fabrication work for the the filter frontal pipework to four sandfilters.
  • West Walton
    Installation of liftable grids to upgrade the existing oxidation ditches to allow it to cope with the full works flow.
  • Ilkeston
    Replacement of an old ceramic disc system with new high-efficiency plate diffusers in a very tight programme duration.