- Value:
- £320,000
- Client:
- Anglian Water
There were some operational challenges to overcome to allow the installation to go without interruption to the process.
The project involved breaking into the pipe to replace sections of the pipe within a short time frame. This was restricted by the time that the air flow could be stopped for to allow the manufacturing to take place.