Cliff Quay

Suprafilt installed a liftable grid system without draining the tanks during the live installation – working in close partnership with the operators of the Wastewater Treatment Works.
Project Overview
Value:
£320,000
Client:
Anglian Water

There were some operational challenges to overcome to allow the installation to go without interruption to the process.

The project involved breaking into the pipe to replace sections of the pipe within a short time frame. This was restricted by the time that the air flow could be stopped for to allow the manufacturing to take place.

Related Projects

  • Itchen Bank
    Suprafilt installed a liftable grid in an oxidation ditch, featuring PTFE coated membranes.
  • Strongford
    Suprafilt successfully provided a new aeration system and associated services for Severn Trent’s Waste Water Treatment Plant at Strongford, Staffordshire.
  • Simpsons Malt
    An aerated grid system installed at Simpsons Malt made an immediate visible difference and paid for itself within a month of installation.