Case Studies

Clipstone

Fabrication work for the the filter frontal pipework to four sandfilters.
Project Overview
Client:
MWH

Related Projects

  • Castleford
    Suprafilt carried out a complete aeration solution to the new build works for Yorkshire Water – including blowers, air mains, valves, diffusers and mixers in the anoxic zones that are depleted of dissolved oxygen.
  • Cliff Quay
    Suprafilt installed a liftable grid system without draining the tanks during the live installation – working in close partnership with the operators of the Wastewater Treatment Works.
  • Itchen Bank
    Suprafilt installed a liftable grid in an oxidation ditch, featuring PTFE coated membranes.