West Walton

Installation of liftable grids to upgrade the existing oxidation ditches to allow it to cope with the full works flow.
Project Overview
Value:
£600,000
Client:
Anglian Water

Completed in two phases, the live installation was completed without draining the tanks or interrupting the tanks.

The client also saw a large energy saving on completion of the works.

Related Projects

  • Clipstone
    Fabrication work for the the filter frontal pipework to four sandfilters.
  • Castleford
    Suprafilt carried out a complete aeration solution to the new build works for Yorkshire Water – including blowers, air mains, valves, diffusers and mixers in the anoxic zones that are depleted of dissolved oxygen.
  • Cliff Quay
    Suprafilt installed a liftable grid system without draining the tanks during the live installation – working in close partnership with the operators of the Wastewater Treatment Works.