Fabrication work for the the filter frontal pipework to four sandfilters.
Client: MWH
Suprafilt dramatically reduced their installation time on site...
Rigorous testing in Barcelona helped to prove the...
Suprafilt have completed work on their very first...
Suprafilt have used their knowledge and expertise to...
A build-up of thick chalky calcium carbonate proved...
Suprafilt’s innovative aeration solution delivered a 50% energy...
Installation of liftable grids to upgrade the existing...
Suprafilt carried out a complete aeration solution to...
Suprafilt installed a liftable grid system without draining...
Suprafilt installed a liftable grid in an oxidation...
Suprafilt successfully provided a new aeration system and...
An aerated grid system installed at Simpsons Malt...
Aeration Specialists Suprafilt have seen a 45% reduction...
Suprafilt were selected to supply an aeration system...
The installation of the innovative Nereda technology at...
The installation of innovative Nereda technology at Failsworth...