Case Studies

Hull Saltend

Suprafilt’s innovative aeration solution delivered a 50% energy reduction once work had been completed at Hull Saltend Sewage Treatment Works.
Project Overview
Value:
£2.2 million
Client:
Yorkshire Water

The site processes 40 million gallons of sewage and industrial waste every day and the brief was to resolve odour problems, which had been ongoing for over a decade.

The £2.2million contract, which was our largest to date, required a quick-turn around and was delivered on time in May 2016.

Related Projects

  • Ilkeston
    Replacement of an old ceramic disc system with new high-efficiency plate diffusers in a very tight programme duration.
  • West Walton
    Installation of liftable grids to upgrade the existing oxidation ditches to allow it to cope with the full works flow.
  • Clipstone
    Fabrication work for the the filter frontal pipework to four sandfilters.
  • Castleford
    Suprafilt carried out a complete aeration solution to the new build works for Yorkshire Water – including blowers, air mains, valves, diffusers and mixers in the anoxic zones that are depleted of dissolved oxygen.